Procedures for drone flights in civil CTRs

Geographical zones in civil CTRs

To facilitate drone flights within the CTRs, the Eelde CTR, Lelystad CTR, Maastricht CTR, Rotterdam CTR and Schiphol CTR have been divided into zones with different conditions. Depending on the zone, drone flights are permitted with or without authorisation from air traffic control.

Below you can read about the structure of these zones and the conditions that apply to each one. For the latest zone classification, please consult GoDrone or veiligdronevliegen.nl, a website run by the Ministry of Infrastructure and Water Management.

Zones within the Eelde CTR, Lelystad CTR, Rotterdam CTR and Schiphol CTR

Zones within the Maastricht CTR

Requirements for drone flights in zones 1, 2B and 4

Do you want to fly a drone in zones 1, 2B and 4? The requirements are explained below.

Zone

Do I need to submit a flight plan via GoDrone?

Do I need flight clearance?

Do I need two-way radio contact?

Zone 1

Yes

Yes

Yes

Zone 2B (within 30 metres of buildings, obstructions and obstacles)

Yes

No

No

Zone 2B (at least 30 metres away from buildings, obstructions and obstacles)

Yes

Yes

Yes

Zone 4 (within 30 metres of buildings, obstructions and obstacles)

Yes

No

No

Zone 4 (at least 30 metres away from buildings, obstructions and obstacles)

Yes

Yes

Yes

Requirements for drone flights in zones 2A and 3

Do you want to fly a drone in zone 2A or 3? Please consult the website of the Ministry of Infrastructure and Water Management –vliegen rondom een luchthaven (Dutch).

Application procedure for drone flights in civil CTRs

With effect from 26 November 2026, the following application procedure will apply to drone missions in the Eelde CTR, Lelystad CTR, Maastricht CTR, Rotterdam CTR and Schiphol CTR:

  1.  Submit a mission plan via GoDrone if you are carrying out a drone flight in zones 1, 2B and 4. You must do this at least two days before the start of the flight, no later than 1000 LT.  By doing so, you are applying for provisional authorisation from the Operational Helpdesk.

    Please note!
    Drone flights within 30 metres of structures, obstructions and obstacles in zones 2B and 4 fall outside the area of responsibility of air traffic control, but you must still submit a mission plan via GoDrone. This mission plan will be automatically approved and you will not receive air traffic services. The following two steps do not apply.

  2. Two days before the drone mission, by 1500 LT at the latest, you will be notified if the maximum number of drone flights in the requested time slot has been reached, with a request to adjust the times.

  3. Submit your final flight times via GoDrone by 1000 LT, at the latest one working day before your drone mission.  

Mission area spanning two zones?

Does your mission area span two zones, one of which falls within and one outside the area of responsibility of air traffic control? If so, you must split the area into two separate mission plans and carry out the flights as two separate missions: 

  • one mission plan for the part within the air traffic control area of responsibility; and 

  • one mission plan for the part outside the air traffic control area of responsibility.

 If you do submit a mission plan that partly falls outside the air traffic control area of responsibility, your application will be rejected.  

Drone flights in zones 2A and 3?

For flights in zones 2A and 3, you do not need to submit a mission plan to LVNL via GoDrone. See the website of the Ministry of Infrastructure and Water Management –vliegen rondom een luchthaven (Dutch).

Authorisation and clearance

  • The Operational Helpdesk coordinates your mission plan with the tower controller and issues provisional authorisation, depending on the situation.

    Please note! 
    In the case of a drone mission within the Rotterdam CTR, you will receive provisional authorisation one working day in advance, no later than 1500 LT.

  • The final authorisation to fly (clearance) is granted by the tower controller.

  • LVNL may set a maximum limit on the number of simultaneous drone flights within a civil CTR.

    • If this maximum is reached, no provisional authorisation will be granted. 

    • The tower controller may refuse or withdraw clearance for safety reasons.   

Flight operations

  • You must conduct the flight in accordance with visual flight rules (VFR) and keep the drone within visual line of sight (VLOS) at all times.

  • Special VFR is permitted within the Eelde CTR, Lelystad CTR, Maastricht CTR, Rotterdam CTR and Schiphol CTR within the UDP, provided the tower controller has granted clearance for this.

  • The flight must remain within the flight area authorised by the Operational Helpdesk. To this end, set up a geocage that corresponds to the authorised flight area. Test the geocage on the ground prior to the flight. Only request flight clearance from the tower controller once the geocage is working correctly.

  • The following applies to radio contact with the tower controller:

    • Within civil CTRs, you are required to maintain two-way radio contact with the tower controller. Preferably use a 10-metre antenna to maintain a good radio link even at low altitudes.  

    • If radio contact is lost during the flight and two-way radio contact is no longer possible, you must terminate the flight immediately. You must then report the flight to the Operational Helpdesk or, outside the Operational Helpdesk’s opening hours, to the Flight Service Centre (FSC).

Contact

Drone flight planning

Intermediary between drone operators in CTRs and air traffic control

For contact regarding requests and the planning of drone flights in CTR’s, the Flight Service Centre (FSC) can be reached at the telephone number and email address below. Daily between 10 a.m. and 3 p.m.

Drone flight planning

Contact

Flight Service Centre

Service provider for aeronautical information, flight preparation and flight plans

The Flight Service Centre is all about aviation information and support for airmen and air traffic control 24/7. The flight service specialists approve flight plans and ensure that airmen are aware of the latest status of their flight path. They keep track of airspace changes and notify airmen by NOTAM of deviations from the ‘normal’ situation. They also monitor whether flights to destinations without air traffic control have landed safely and arrange messaging between international air traffic centres.

Post:

LVNL
Amsterdam Flight Service Centre
P.O. Box 75200
1117 ZT Schiphol Airport
The Netherlands

AFS: EHAMZPZX